SWC Forums
Pull up a chair...let's talk fishing.
Has anyone seen the 2017 dredge schedule for NC
Has anyone seen the 2017 dredge schedule for NC
All I've heard of right now is Cow Channel/Bear Island in Swansboro.
"Since December 19, 2016 access to Bear Island has been restricted and Cow Channel closed due to the Cow Channel Dredging Project. The project necessitates the close of portions of Bear Island including the Bear Island ferry dock, path to the oceanfront, campsites on (1) through eleven (11), and group campsites A & B. Campsites twelve (12) through fourteen (14) will remain open for camping. Barring any unforeseen delays, we hope to reopen campsites and facilities on the island around March 15, 2017."
Sunset Beach was supposed to be started and finished in December, but it looks like they are behind schedule http://www.sunsetbeachnc.gov/vertical/sites/%7BA2C1D077-15B6-49E5-B8FD-53D65FA0DC5D%7D/uploads/Shoreline_Management_-_Pre-Dredge_Analysis_-_January_2017_Progress_Report.pdf
Thanks for the info Pirate Juan, was just wondering if Bogue Inlet was going to see a dredge in the spring.
the Corp has a dredge schedule but I can not find it