They came and got the buoy's out of the inlet. Hopefully the state will come up with the money to dredge by Spring.
That should make it interesting. I ran that inlet last Sunday at half-tide and it didn't seem to bad. Hope I can remember the route, cause if you miss, you hit very shallow water very quickly. (Not to mention that half submerged Civil War wreck).
The Corp published a list of waypoints for the wrecks and the "debris" fields for Lockwood inlet a few years ago, maybe someone still has them and could publish them again, at least all we'd have to deal with would be sand then.
Sea tow had to pull one off the bar today at low tide.
Latest survey is at the Army Corp of Engineer's Wilmington website.
Coast Guard temporarily removes navigational aids from Lockwoods Folly Inlet
WILMINGTON, N.C. – Coast Guard Sector North Carolina personnel temporarily removed the aids to navigation from Lockwoods Folly Inlet this week due to severe shoaling in the waterway.
Shoaling conditions in the area were exacerbated in late August by Hurricane Irene. Depths of less than three feet exist in many areas of Lockwoods Folly Inlet, less than the congressionally authorized federal navigation depth for this inlet.
Sector North Carolina personnel dispatched the Coast Guard Cutter Bayberry crew to remove the buoys because channel depths are not adequate to sustain safe navigation. The Coast Guard has issued a notice to mariners via marine radio to inform boaters that aids to navigation in Lockwoods Folly Inlet were removed and urge mariners to use alternate channels to access the Atlantic Ocean.
The Coast Guard plans to replace the navigational buoys when channel conditions improve and traffic can safely transit through the inlet.
For additional information, contact Cmdr. Steve McGee at 910-772-2225 or the Sector North Carolina Command Center at 910-343-3882.
The state and local governments have the money, the problem is with some legal language in the memorandum of agreement between them and the Corps of Engineers. Rep. Mike McIntyre has met with the Secretary of the Army to expedite the process and the inlet could be dredged as early as mid-December. This info from Andrew Simpson in Mr. McIntyre's office. As effective as the Congressman has been in the past on this issue, I wouldn't be surprised to see it happen sooner.
Right now the new dredge, the Murden, is scheduled to be in LWF March 15-30 2012 and at Carolina beach after that.
Why dredge in December when the majority of the boats will not use it until at least April or May? It would probably need dredged again at that time if they do it in December due to the big North Easter's that come thru in the winter. i would rather they wait until March so that it will hopefully stay open through the summer when it is used the most.
Right now the new dredge, the Murden, is scheduled to be in LWF March 15-30 2012 and at Carolina beach after that.
Why dredge in December when the majority of the boats will not use it until at least April or May? It would probably need dredged again at that time if they do it in December due to the big North Easter's that come thru in the winter. i would rather they wait until March so that it will hopefully stay open through the summer when it is used the most.
That is exactly what most of us are saying, wait until the end of March to dredge, otherwise it will be closed before the season opens.
It is my understanding the monies approved by the county, Oak Island, and HB are for a one-time dredging. If this is true, the inlet will not be maintained once dredged.
It is my understanding the monies approved by the county, Oak Island, and HB are for a one-time dredging. If this is true, the inlet will not be maintained once dredged.
All the more reason to hold the money till next spring when the closures open up.