SWC Forums

Pull up a chair...let's talk fishing.

New River Dredging
 
Notifications
Clear all

New River Dredging

3 Posts
3 Users
0 Reactions
8,370 Views
Ed
 Ed
(@aftergolf)
Famed Member
Joined: 23 years ago
Posts: 2170
Topic starter   [#46959]

From the latest Notice to Mariners -

NC – DREDGING OPERATIONS IN THE VICINITYOF THE NEW RIVER/AICWW – SNEADS FERRY NC- DREDGING

Mariners are advised that the contractor, Marion & Cottrell, will be conducting dredging operations in the vicinity of the New River and AICWW
intersection to Cedar Bush Cut Channel. The vessels MARION, SAXON, and BLACKHAWK will be operating on a twenty-four hour a day, seven
days a week schedule until approximately April 30th , 2016. A floating pipeline will be located from the dredging operation, following the South side
of the channel to the disposal area along the northern 1 mile, oceanfront section of North Topsail Beach. The equipment staging area for the
operation will be on the South side of the channel, between the AICWW and Cedar Bush Cut. Mariners are urged to use caution and are
requested to pass at a safe distance away from the dredge, attending equipment, work boats, pipeline and buoys. The dredging vessels can be
contacted VHF radio channels 13 & 16. CHART# 11541



   
Quote
Fernie Brown
(@)
Prominent Member
Joined: 16 years ago
Posts: 784
 

More sand for the inlet.



   
ReplyQuote
David Blackmon
(@spacesaver)
Estimable Member
Joined: 14 years ago
Posts: 213
 

Yep. I was actually excited until I kept reading and realized what they are doing. AGAIN
Thanks for the update.



   
ReplyQuote
Share: