FINAL REPORT ON COSTS, BENEFITS, AND MANAGEMENT ISSUES RELATED TO MAINTAINING NORTH CAROLINAS SHALLOW DRAFT NAVIGATION CHANNELS
SUMMARY OF FINDINGS
The key findings with regard to the costs, benefits, and management issues related to maintaining North Carolina s shallow draft navigation channels are:
Over the last 30 years, over 800 dredging projects and 100 million cubic yards of material have been dredged to maintain the shallow draft waterways.
Recent annual costs have been almost $15 million to dredge an average of 3.4 million cubic yards. Peak years have reached over 5 million cubic yards at a cost of $25 million (today s dollars).
Most shallow draft dredging projects have a depth of 6 to 14 feet.
Recent dredging has concentrated on key coastal inlets and the associated channels while the AIWW has developed a significant backlog.
Dredged material from inlets is typically placed in open water in close proximity to the channel. The AIWW, its inlet crossings, and inland waterways are generally dredged by pipeline with upland or beach placement.
The shallow draft navigation channels provide a significant impact on the States economy.
The shallow draft waterways primary economic impacts are on recreational boating, commercial fishing, tourism and marine trades.
Despite the lack of currently available economic data specifically linked to shallow draft waterways, the economic impact can be shown to be in the hundreds of millions of dollars annually.
The people of North Carolina consider these shallow draft channels a part of their way of life and heritage.
Poor maintenance represents a safety hazard to vessels using the inlets and waterways and impacts travel along the AIWW.
Numerous options exist, in the absence of federal funding, to finance the maintenance of shallow draft waterways. Other jurisdictions have successfully implemented approaches including property taxes, sales taxes, fuel taxes, licensing fees and user fees.
The shallow draft inlets and channels of North Carolina present unique technical challenges to dredging that have resulting in the Wilmington District of the USACE maintaining a fleet of dredges not currently available from private contractors. These dredges, specially suited to operate in shallow exposed coastal inlets, include two sidecasters and one special purpose (small split hull hopper) dredge. The use of special dragheads and the open water disposal allow these dredges to be exempted from turtle and bird environmental windows and operate nearly year round.
The USACE has existing environmental permits to dredge the federally authorized shallow draft projects within the State that cannot be directly transferred to a state or local entity.
One of the main difficulties the State would face if it assumed dredging operations would be obtaining environmental permits. Little documentation is available for the existing USACE permits and significant time and money expenditures would be required to develop these new permits. New regulations may also impact these permits and alter preferred disposal methods.
At present, the most straightforward option given the uncertainty regarding future federal funding and need to maintain these vital State waterways would be to enter into contractual agreements with the USACE to supplement their dredging budget as needed for projects of State interest.
The economic and social importance of maintaining these waterways justifies the annual cost.
Download Report Here 17 megs